HYDROPOWER PLANTS constructed on the basis of the projects of JSC “HYDROPROJECT”

Name of HPP Channel

Flow rate of HPP m³/s

Installed capacity MW

Number of hydraulic units

Annual electric energy output, mln. kWh

Period of construction

Republic of Uzbekistan
Bozsu Chirchik-Bozsu tract 48 4 4 32 1923-1926
Kadiryo Chirchik-Bozsu tract 52 13,2 4 112 1930-1933
Burdjar Chirchik-Bozsu tract 45 6,4 2 45 1933-1936
Chirchik (Komsomol'skaya) Chirchik-Bozsu tract 274 84 4 428 1932-1940-1956
Tavaksay Chirchik-Bozsu tract 278 72 4 351 1932-1941-1956

Ak-Kavak №1 (Troitskaya)

Chirchik-Bozsu tract 126,8 33,8 2 172 1941-1943-1951
Kibrai (Ak-Kavak№3) Chirchik-Bozsu tract 76,2 11,2 1 89 1942-1944
Aktepa Chirchik-Bozsu tract 45 15 1 80 1941-1943
Salar Chirchik-Bozsu tract 73,2 11,2 1 85 1943-1944
Lower-Bozsu №1 Chirchik-Bozsu tract 45 10,7 1 41 1942-1944