HYDROPOWER PLANTS constructed on the basis of the projects of JSC “HYDROPROJECT”

Name of HPP Channel

Flow rate of HPP m³/s

Installed capacity MW

Number of hydraulic units

Annual electric energy output, mln. kWh

Period of construction

Central Vakhsh channel 18 18 2 114 1960-1964
Khorog (new) Gunt river 10 10 5 80 1965-1971
Nurek Vakhsh river 2700 2700 9 112000 1961-1979
Baipaza Vakhsh river 600 600 4 2685 1978-1985
Sangtuda №1 Vakhsh river 670 670 4 2733 1987-наст.вр.
Pamir (1st queue) Gunt river 14 14 2 143 1985-1993
Republic of Turkmenistan
Kaushutbent Murgab river 13,6 0,8 1 6 1944-1946
Kolkhozbent Murgab river 42 3,2 4 24 1949-1952
Republic of Kazakhstan
Shardara Syrdarya river 778 100 4 540 1958-1966
Republic of Afghanistan
Pol-e-Khomri HPS №2 Kunduz river 60 9 3 55 1959-1962
Naghlo HPS Kabul river 172,5 100 4 440 1960-1966
Socialist Republic of Vietnam
SeSan 3 Se San river 274 260 2 1221,4 2001-2005