HYDROPOWER PLANTS constructed on the basis of the projects of JSC “HYDROPROJECT”

Name of HPP Channel

Flow rate of HPP m³/s

Installed capacity MW

Number of hydraulic units

Annual electric energy output, mln. kWh

Period of construction

Buurdin Chu river 40 8,7 3 46 1950-1952
Alamedin №4 spillway of WGCC 25 2,4 2 17 1949-1952
Alamedin №5 spillway of WGCC 50 6,4 2 35 1954-1957
Alamedin №6 spillway of WGCC 50 6,4 2 35 1954-1958
Uchkurgan №1 Naryn river 727 180 4 820 1956-1964
At-Bashi At-Bashi river 70 40 4 165 1963-1970
Toktogul Naryn river 960 1200 4 3857 1962-1977
Kurpsay Naryn river 972 800 4 2634 1976-1986
Tash-Kumyr Naryn river 957 450 3 1630 1980-1987
Shamaldy-Say Naryn river 1035 240 3 880 1986-1995
Republic of Tadjikistan
Upper-Varzob Varzob river 7,5 7,2 2 54 1931-1938
Khorog Gunt river 1 1 2 6 1938-1941
Lower-Varzob №1 Varzob river 14.8 14,8 3 93 1943-1949
Takob Takob river 1,3 1,3 2 6 1945-1947
Lower-Varzob №2 Varzob river 3,5 3,5 2 23 1949-1951
Kairakum Syrdarya river 126 126 6 688 1951-1957
Perepadnaya Vakhsh channel 29,6 29,5 3 215 1954-1960
Golovnaya Vakhsh river 210 210 6 1150 1956-1963