HYDROPOWER PLANTS constructed on the basis of the projects of JSC “HYDROPROJECT”
Page 4 of 6
Name of HPP | Channel |
Flow rate of HPP m³/s |
Installed capacity MW |
Number of hydraulic units |
Annual electric energy output, mln. kWh |
Period of construction |
Andijan HPS №1 | Andijan reservoir | 192 | 140 | 4 | 435 | 1976-1985 |
Urgut | Dargom channel | 40,4 | 3 | 6 | 11,8 | 2003 |
HPS at the Tupolang reservoir (1st queue) | Tupolang river | 24 | 30 | 2 | 63,3 | 2006 |
Akhangaran HPS | Akhangaran reservoir | 41,6 | 21 | 2 | 66,6 | 2010 |
Andijan HPS № 2 | Andijan reservoir | 70 | 50 | 2 | 114,8 | 2010 |
Gissarak HPS | Gissarak reservoir | 44,5 | 45 | 2 | 79,4 | 2011 |
Republic of Kyrgyzstan | ||||||
Ak-Tuz | Ak-Tuz river | 0,6 | 1,5 | 2 | 11 | 1937-1939 |
Voroshilovskaya (Lebedinovskaya) | Western Grand Chuy channel (WGCC) | 42 | 7,8 | 3 | 65 | 1941-1943-1948 |
Osh | Akbura river | 0,4 | 1 | 3 | 1943-1944 | |
Alamedin №1 | spillway of WGCC | 25 | 2,2 | 2 | 18 | 1944-1945 |
Prjevalskaya | Arasal river | 1,5 | 0,7 | 2 | 4 | 1943-1946 |
Alamedin №2 | spillway of WGCC | 25 | 2,4 | 2 | 20 | 1944-1947 |
Alamedin №3 | spillway of WGCC | 25 | 2,4 | 2 | 20 | 1947-1951 |